DPW will be closed on July 4th. Recycling will NOT be collected. Parking is free. Details: https://www.burlingtonvt.gov/dpw/After-Hours
Construction and downtown detour info: Visit our construction portal.
DPW will be closed on July 4th. Recycling will NOT be collected. Parking is free. Details: https://www.burlingtonvt.gov/dpw/After-Hours
Construction and downtown detour info: Visit our construction portal.
It is vital that we continually assess the water distribution system and identify mains that need to be updated. New or relined mains reduce the change of future main breaks, increase fire flow capability and improve our long term water quality. We utilize two different methods for water main rehabilitation: Cured in Place Pipe (CIPP) relining and open dig replacement. Open dig replacement is how these improvements were traditionally done, but we have found CIPP to be more cost effective and less disruptive to property owners and pedestrians. However, there are times when replacement is the only option, like changing the diameter of the water main. We have recently completed work on the following streets:
2023
2022
2021
Institute Road (Campground to BHS Track)
2020
All projects were delayed because of the pandemic
2019 (Relining)
2019 (Replacement)
2018 (Relining)
2018 (Replacement)
2017 (Relining)
2017 (Replacement)
2016 (Relining)
Other Replacements
>>> Click HERE to return to the PAST WATER RESOURCES PROJECTS PAGE