Traffic calming is the addition of roadway features (bump outs, speed humps, chicanes, lane striping, etc) to reduce vehicle speeds or the amount of vehicles on a particular road or a particular area. The goals of traffic calming are to improve the quality of life within a residential or commercial area, increase the safety of pedestrians and bicyclists, and reduce automobile speeds.
1. Contact DPW about traffic concerns on your street via SeeClickFix or email.
2. DPW will collect traffic data if needed (April - October). DPW will review crash history and traffic data to assess speed conditions and identify the percent of heavy truck traffic.
3. If data exceeds the thresholds from the Traffic Calming Manual (available below), DPW will determine your street's place in the queue and develop a traffic calming improvement plan based on the context of your streets. The improvement plan will be shared with the neighborhood but will not require a neighborhood vote.
4. If data does not meet the thresholds for traffic calming, resources will be provided for neighborhood enhancements to pursue separately.
Traffic calming will prioritize safety first based on:
#1: streets with 85th percentile speeds exceeding the speed limit or slow zone target speed by more than 5 mph; or with a fatal crash or crash involving a person walking or biking within the last 5 years.
#2: construction activity that should be coordinated with other projects.
#3: streets with no traffic calming.
#4: streets with traffic calming.
#5: streets that have had traffic calming installed within the last 5 years.
Current Status: project initiation / concept design
Visit the project website: https://www.burlingtonvt.gov/dpw/transportation/eap2024
Visit the project website: https://www.burlingtonvt.gov/dpw/transportation/eastave
Current Status: design complete, construction planned for 2024
View slides from the January 18, 2022 neighborhood meeting
Current Status: installation completed 2023
Current Status: design completed, installation completed in Summer 2023
March 29, 2023 In-Person/Virtual Meeting
O.N.E. Community Center at 6 pm, and online via Zoom
Join Zoom Meeting:
Meeting ID: 984 9324 4985
Passcode: 495227
View the slides presented during the meeting.
Review the meeting notes.
Current Status: design complete. installation completed Fall 2023
Current Status: design completes, construction completed in Spring 2022
Contact DPW via See Click Fix or Customer Service at 863-9094 or email